Oops! Tidy Up level guide

Oops! Tidy Up Sunlit Lodge Levels 1-2 Walkthrough

medium 3 colors

Sunlit Lodge is a two-stage, two-storey home: furnish the lower living room, kitchen, desk, and stair structure, then complete the upper bedroom beneath a sloped glass roof with curtains and vines.

Sponsored
Open on YouTube

If the player asks you to sign in, open the video on YouTube instead.

How to Solve Oops! Tidy Up Level 23 — Full Solution

  1. Stage 1: Build the left stair and loft frame, place the yellow sofa at the front, and set the kitchen counters and refrigerator along the right wall.
  2. Stage 1: Add the rear desk, monitor and chair, center coffee table, rugs, side cabinets, and sink/stove equipment.
  3. Stage 1: Fill the kitchen and workspace with the laptop, dishes, small appliances, books, lamps, wall shelves, and framed pictures.
  4. Stage 1: Put the large plant beside the yellow sofa, desk plants on the rear worktop, cushions on the sofa, and the flower vase on the center coffee table beneath the open stair line.
  5. Stage 1: Finish the stair rail and upper transparent panel only after the lower room is stocked, then clear the first floor.
  6. Stage 2: Place the bed on the right, yellow sofa on the left, long rear shelf, side tables, right door, and low storage pieces.
  7. Stage 2: Add bedding, pillows, lamps, books, pet bed, clothing, plants, pictures, and the window-side bench.
  8. Stage 2: Install the sloped glass roof, roof ladder, curtains, and hanging vines after all interior anchors are filled.
  9. Stage 2: Add the final cat and small bedside objects, then clear the upper room and reveal the completed two-storey lodge.

Colors in this level:

Sunlit yellow, Warm oak, Leaf green

Common Mistakes to Avoid

  • Closing the lower stair glass before filling the desk, kitchen, coffee table, and plants behind its frame.
  • Treating the upper room as a simple bedroom and forgetting the yellow sofa, pet space, rear shelf, or window-side storage.
  • Installing the greenhouse roof before the curtains, vines, wall décor, and interior furniture are settled.
Sponsored

Quick Tips for Oops! Tidy Up Level 23 (quick clues)

  • Keep the Stage 1 stair frame open while filling the desk and kitchen beneath it.
  • Finish the upper bed, sofa, shelves, door, and plants before spanning the sloped roof.
  • Use the final full-house reveal to confirm both storeys cleared, not just the visible upper room.
Board notes 5 details
Layout
Stage 1 places a yellow sofa at the front, kitchen and refrigerator at right, desk at the rear, and a wooden stair frame along the left. Stage 2 combines a right bed, left yellow sofa, rear shelving, door, plants, and a greenhouse-style roof.
Goal
Finish both storeys with structural stairs and glazing, all living and sleeping furniture, kitchen and desk equipment, plants, textiles, wall décor, pets, and small household items.
Opening
Build the Stage 1 stair, sofa, kitchen, refrigerator, and desk first; upstairs anchor the bed, sofa, shelf, door, and storage before the glass roof.
Danger Zone
The stair rail and sloped roof overlap furniture and wall anchors, so transparent pieces placed too early hide the routes for appliances, plants, curtains, bedding, and décor.
Mechanics
Sunlit Lodge stacks two rooms vertically and uses late transparent structures to close each floor after the interior has been fully furnished.

Frequently Asked Questions

  • What belongs on the lower floor of Sunlit Lodge?

    The lower floor contains the yellow sofa, living table, right-side kitchen and refrigerator, rear work desk, plants, and the wooden stair structure.

  • When should I place the Sunlit Lodge roof?

    Add the sloped glass roof after the upper bed, sofa, shelves, door, curtains, plants, and small bedroom objects are in place.

  • How do I know Sunlit Lodge is complete?

    Clear both Stages and wait for the final reveal that shows the furnished upper bedroom stacked over the completed living-kitchen floor.

Sponsored