Oops! Tidy Up level guide

Oops! Tidy Up Little Retreat Levels 1-2 Walkthrough

hard 3 colors

Little Retreat first builds a monochrome open-plan kitchen and lounge beneath a late staircase, then turns a separate bedroom into a music studio before completing its central bed and canopy.

Sponsored
Open on YouTube

If the player asks you to sign in, open the video on YouTube instead.

How to Solve Oops! Tidy Up Level 40 — Full Solution

  1. Stage 1: Fit the rear sliding panels and right doorway, mount the dark wall cabinet, and place the pale rug and glass coffee table.
  2. Stage 1: Build the rear-right kitchen with white cabinets, black counters, sink, oven, refrigerator, and short return.
  3. Stage 1: Add the dining table and chairs, black sectional and ottoman, side surfaces, floor lamp, and tall plants.
  4. Stage 1: Place cookware, cups, food, appliances, books, cushions, flowers, wall art, and the case beside the door.
  5. Stage 1: Install the steep open staircase across the right half after the room below is complete to trigger the clear.
  6. Stage 2: Lay the burgundy rear platform and place the mirror, window, side cabinet, oval rug, right desk, and swivel chair.
  7. Stage 2: Set the keyboard and drum kit left-rear, mount the record displays, and add speakers and amplifiers.
  8. Stage 2: Put the acoustic and electric guitars on floor stands, then place desk gear, stool, lamps, plants, and accessories.
  9. Stage 2: Build the central bed, arrange its pillows and tan blanket, and attach the dark overhead canopy.
  10. Stage 2: Add the pendant-light group and final bedside accents to complete the bedroom and music studio.

Colors in this level:

Charcoal black, Clean white, Burgundy red

Common Mistakes to Avoid

  • Installing the Stage 1 staircase before the kitchen counter, dining area, plants, and low living-room objects are complete.
  • Placing Stage 2 guitars, drums, or keyboard inside the central sleeping footprint instead of around the rear and side edges.
  • Building the Stage 2 bed and canopy before the desk gear, speakers, stands, plants, and small music accessories are anchored.
Sponsored

Quick Tips for Oops! Tidy Up Level 40 (quick clues)

  • Stock every kitchen counter and living-room surface before placing the Stage 1 staircase.
  • Keep the Stage 2 keyboard and drums left-rear, desk equipment right, and each guitar on its own floor stand.
  • Build the Stage 2 bed, canopy, and pendant lights only after all low instruments and accessories are anchored.
Board notes 5 details
Layout
Stage 1 puts a kitchen at rear-right, a pale rug and glass table center-left, a black sectional front-right, and stairs across the right half. Stage 2 surrounds a central bed with a rear music platform, left instruments, and a right desk.
Goal
Complete the kitchen-lounge and its final open staircase, then place every instrument, work surface, bed layer, canopy, and light in the combined bedroom studio.
Opening
Stage 1: install rear panels, wall cabinet, rug, table, and kitchen shells. Stage 2: place the rear platform, mirror, window, side cabinet, oval rug, desk, and chair.
Danger Zone
The Stage 1 staircase hides kitchen and lounge anchors; the Stage 2 bed and canopy cover the instrument zone, so small counter, floor, and stand objects must come first.
Mechanics
Each Stage finishes with a large architectural layer: an open staircase closes the furnished apartment, while a central bed, canopy, and pendant group close the music bedroom.

Frequently Asked Questions

  • What triggers the Stage 1 clear in Little Retreat?

    The open staircase is the final large structure, so complete the kitchen and lounge beneath it before installing the stairs.

  • Where do the Stage 2 instruments belong?

    Keep the keyboard and drum kit left-rear, speakers and amplifiers near them, and the two guitars on separate floor stands.

  • When should I build the Stage 2 bed?

    Build it after the instrument and desk zones; the central bed, canopy, and pendant lights are the late covering layers.

Sponsored